05 — Product Management
Product Management — Lesson 5 of 6

Agile &
Scrum

Two-week sprints. Daily standups. Retrospectives. Watch a sprint ring turn through its five ceremonies, stories drop from the backlog, and velocity grow sprint over sprint.

Waterfall assumes you know everything upfront. Agile assumes you don't. Instead of a 12-month plan, you work in 2-week sprints, ship something real, learn from users, and adjust. Scrum is the most common Agile framework: it gives teams a shared cadence of planning, building, reviewing, and improving — four ceremonies, one cycle, repeated forever.

The Sprint Cycle

Sprint ring with 5 phase boxes. Press Start Sprint to run the cycle — a dot travels around the ring and story cubes drop in. Press Show Velocity to see sprint-over-sprint improvement.

drag — scroll to zoom

Code example

A sprint planning ticket structure and a simple Kanban board state machine.

AGILE PATTERNS
// Sprint planning ticket — Linear/Jira compatible structure

const sprintTicket = {
  id: 'ENG-347',
  title: 'Salary filter on job listings',
  type: 'story',  // story | bug | task | spike
  points: 3,         // relative effort, not hours
  priority: 'high',

  sprint: {
    name: 'Sprint 14',
    start: '2026-07-07',
    end:   '2026-07-18',
    goal:  'Improve job seeker filtering experience',
  },

  // Scrum ceremonies this ticket touches
  planning: {
    // Team committed to this in sprint planning
    committed_by: ['@kai', '@maya'],
    blockers: [],
  },

  // Updated in daily standup (15 min, same time, standing)
  standup: {
    yesterday: 'Implemented filter UI component',
    today:     'Writing unit tests for edge cases',
    blocked:   false,
  },

  // Reviewed in sprint review (demo to stakeholders)
  review: {
    demoed:   true,
    accepted: true,  // PO accepted against acceptance criteria
    feedback: 'Add a max salary range in next sprint',
  },

  // Retro: what worked, what didn't, one change next sprint
  retro_action: 'Add test coverage check to PR template',
};

// Velocity = story points completed per sprint
// Track over 4+ sprints to get a reliable average
const velocity = [18, 22, 21, 26, 28];  // improving over time
const avgVelocity = velocity.slice(-3).reduce((a,b)=>a+b,0)/3;
# Kanban board state machine
# Kanban = continuous flow; no sprints, no time-boxes
# Good for: support queues, ops work, bug triage

from enum import Enum, auto

class State(Enum):
    BACKLOG    = auto()
    READY      = auto()  # refined, estimated, acceptance criteria written
    IN_PROGRESS= auto()
    IN_REVIEW  = auto()  # PR open, tests green
    DONE       = auto()

TRANSITIONS = {
    State.BACKLOG:     [State.READY],
    State.READY:       [State.IN_PROGRESS, State.BACKLOG],
    State.IN_PROGRESS: [State.IN_REVIEW, State.READY],
    State.IN_REVIEW:   [State.DONE, State.IN_PROGRESS],
    State.DONE:        [],
}

# WIP (Work-In-Progress) limits prevent context switching
WIP_LIMITS = {
    State.IN_PROGRESS: 3,   # max 3 tickets in flight per person
    State.IN_REVIEW:   2,
}

def move(ticket, new_state, board):
    allowed = TRANSITIONS[ticket.state]
    if new_state not in allowed:
        raise ValueError(f"Invalid transition {ticket.state} ? {new_state}")
    wip = board.count(new_state)
    limit = WIP_LIMITS.get(new_state)
    if limit and wip >= limit:
        raise ValueError(f"WIP limit reached for {new_state.name}")
    ticket.state = new_state
    return ticket

# Scrum vs Kanban key difference:
# Scrum = time-boxed sprints, fixed team, planned commitment
# Kanban = continuous flow, WIP limits, measure cycle time

Key concepts

🏃

Sprint

2 weeks — fixed scope — shippable

A fixed-length iteration (usually 2 weeks) with a clear goal. The sprint goal should describe the business outcome — "improve onboarding" not "build feature X." At the end, something shippable must exist.

📋

Backlog

ordered — refined — ready

A prioritized list of all planned work. The Product Owner owns it. "Grooming" (or refinement) is the ongoing process of adding detail, clarifying acceptance criteria, and estimating upcoming stories before sprint planning.

🔄

Retrospective

what worked — what didn't — one change

After every sprint, the team reflects. Three questions: What went well? What didn't? What's the one thing we'll change next sprint? The retro action item is a commitment, not a wish list.

📈

Velocity

story points — trend — forecast

Story points completed per sprint. Don't compare velocity between teams — it's a relative measure calibrated to your team's own estimation scale. Use the 3-sprint rolling average to forecast how much fits in the next sprint.